Freedom Mobile Arch, Vancouver: How Design Assist Made a Mass Timber Starburst Roof Buildable
Design: Revery Architecture | Project: Freedom Mobile Arch (PNE Amphitheatre) | Location: Hastings Park, Vancouver, Canada | Project team: Fast+Epp, EllisDon Corp., Introba, AES Engineering, Stages, PFS Studio, Walters Group Inc., LMDG | Photography: Jonathan Evans Photography, Revery Architecture, Ema Peter, David Kvocak, Brandon Artis, published with bowerbird
At Hastings Park in Vancouver, Revery Architecture’s Freedom Mobile Arch puts a starburst roof of glulam arches and a cross-laminated timber (CLT) deck over an audience of up to 10,000. Revery describes the venue as a precedent for mass timber in the amphitheatre typology, and says it will become Vancouver’s first net-zero carbon cultural project.
The part that matters most for prefabrication is how the roof was made buildable. An early Design Assist process brought the architect, structural engineer, contractor, timber supplier and specialty trades together before the design was fixed, and shaped everything from connection details to crane sequences.


Design Assist – How did the team turn a starburst roof into something buildable?
Revery Architecture worked with Fast+Epp, EllisDon, Nordic Structures and Walters Group from the concept stage, rather than handing a finished design to a builder. The aim was to turn the concept for the roof canopy into a structural system that could be made, shipped and erected efficiently, while keeping the architectural vision and the performance the structure required.
Because the contractor, fabricator and trades were involved early, the group could follow the roof through every stage of its life: fabrication, transport, erection and long-term performance. Simpler transport and easier construction were the recurring goals.



Connections and erection – What changed to make assembly simpler?
The reviews looked closely at the joints, because that is where a large timber structure is won or lost on site:
- Splices. The team developed the splice connections for the glulam and steel beams.
- Concealed fixings. Micro-CLT cover plates hide the connection details, so the timber structure reads as continuous.
- Where timber meets concrete. The junctions where timber meets steel and concrete at the reinforced concrete buttresses were worked out in detail.
- Sequence and plant. How the roof would be sequenced, lifted and temporarily supported was studied alongside the connections, to cut risk and simplify assembly on site.
One practical result was fewer temporary shoring towers. Structural analysis showed that the back-of-house structure could be reinforced to carry the lateral forces generated while the roof went up. That allowed a significant reduction in towers, which eased site logistics and shortened the sequence.


Mock-ups – What did full-scale testing settle before construction?
Targeted mock-ups and prototypes tested the riskiest assumptions before anything was built:
- Roof decking. Full-size CLT samples showed the deck would settle into the curve it needed under its own weight, so the panels could be made without bending them in the factory.
- Integrated lighting. More mock-ups settled where the integrated LED lighting should sit on the roof and how it should be detailed.
- Sprinklers. Coordination studies worked out how the sprinkler pipes could curve with the exposed glulam arches rather than cut across them.
Taken together, the team says the roof became a single answer to architectural, structural and construction questions: simpler to build, quicker to fabricate and erect, and better resolved in its details. In Revery’s account it is one of Canada’s most ambitious mass timber civic structures.


Why mass timber – What drove the choice?
Revery says mass timber met both its sustainability and performance goals. It is renewable and sourced within Canada, and the studio puts the saving in embodied carbon at about 40% compared with steel or concrete on this project. It also supports acoustics and fire performance.
Prefabrication is part of the argument. Factory-made timber elements shorten erection and reduce the temporary shoring needed on site, which helps the schedule and budget.
The roof combines two products. The arches are Black Spruce glulam, chosen for its strength-to-weight ratio, and a Spruce-Pine-Fir CLT deck ties the roof together as a structural diaphragm. Revery presents the starburst as the first of its kind built in mass timber, and notes that the choice lines up with British Columbia’s Mass Timber Action Plan. Timber also brings warmth and a sense of intimacy to a venue of this size.


The venue – What is the experience under the roof?
Revery set out to make a place that keeps shifting and links people to the landscape, to each other and to local culture. The roof lands on three points in the landscape, which leaves the edges open, frames views of the surrounding mountains and keeps the structure feeling light at human scale.
Seating is designed to flex. The lower level has removable seating, so it can switch to standing room for events from a quiet ceremony to a full-scale concert. A raised mid-tier of fixed seating gives clear sightlines, VIP box suites sit close to the stage, and lawn seating at the back blends into the park and lifts capacity to 10,000.




Site and legacy – How does it sit in Hastings Park?
Revery began with people and how they feel in a place. The history of Hastings Park and its backdrop of the North Shore mountains shaped the aim of a world-class covered venue that suits the landscape and keeps the views. The studio wants it to be somewhere people choose to be, with room for different uses and a sense of belonging.
Looking ahead, the team hopes it becomes one of Vancouver’s cultural landmarks, where art, nature and community meet. The timber roof is meant to stand for the city’s climate leadership, to respect Indigenous heritage and to leave a legacy of civic pride.



What it shows about prefabricated timber
- Involve the builder early. Design Assist put contractor and fabricator knowledge into the roof design before it was fixed.
- Design for the truck and the crane. Transport and erection shaped the splices, connections and sequence.
- Prove geometry at full scale. Mock-ups showed the CLT deck could curve under its own weight, avoiding pre-bending.
- Let prefabrication cut temporary works. Reinforcing the back-of-house structure reduced the number of shoring towers.
Photography by Jonathan Evans Photography, Revery Architecture, Ema Peter, David Kvocak, Brandon Artis, published with bowerbird.
Explore more mass timber and CLT projects, or browse all Prefab Projects articles.
More cross-laminated timber work: CLT Houses and Buildings.