Tribe Hotel / IDLE Architecture Studio / Perth
How IDLE Architecture Studio and Tribe stacked 63 factory-made modules into a Perth hotel in 14 days of on-site assembly.
How IDLE Architecture Studio and Tribe stacked 63 factory-made modules into a Perth hotel in 14 days of on-site assembly.
How Palette Architecture used three modules and five panels to build a 1,600 sf East Hampton home in a day of on-site assembly.
How Architecture Building Culture used 15 factory-built modules to fit twelve affordable homes on a small Portland corner site beside the light rail.
How Green Design Architects used partial prefabrication and helicopter delivery to build an alpine hut for 40 walkers on Tasmania’s Overland Track.
How Lachlan Shepherd Architects arranged three shipping containers on a former car park in Torquay to house two small businesses.
How Das Studio designed, fabricated and installed two black-clad, off-grid suites on a bushfire-rated hillside in South Australia’s Inman Valley.
How Anderson Architecture built Sapling, a Sydney CLT home certified to Passivhaus Premium, around an existing jacaranda and a replacement sapling.
How Gardiner Architects used prefabricated CLT to give each of thirteen Thornbury apartments its own plan, despite a late fire-rule change.
How Das Studio designed, fabricated and installed an off-grid retreat for a working Blewitt Springs vineyard with almost no time for on-site building.
How an architect and builder used exposed CLT and a sawtooth roof to add a bridge-like upper floor to a rural multigenerational home.